A builder floor move in Sushant Lok is mostly a staircase job: the goods go down a shared stair, past neighbours' doors, to a truck that waits at the gate. Plan the carry first, then pack by what can safely travel on a stair, and move the tall and heavy pieces before the day rather than on it.

Our pages on Sushant Lok 1, Sushant Lok 2 and Sushant Lok 3 describe the colonies and their lanes. This guide covers the other half: what happens inside the building.

What makes a builder floor move different from a flat?

A builder floor is one household in a small building where each floor is owned or rented separately. The staircase, the entry gate and often the parking space are shared. According to the Wikipedia article on Gurgaon, housing in the city is mostly attached housing, with apartments and high-rise towers becoming more common. Builder floors belong to the attached kind, which is why a move here looks nothing like a tower move.

There is usually no society office to give a slot and no service lift. That puts the weight of the planning on you and the crew. Three things decide the day:

  • how many turns and landings the stair has between your door and the gate
  • how wide the doors and stair turns are for your largest pieces
  • how many other households are using the same stair that morning

How should I pack for a staircase carry?

Pack for the person who carries, not for the room. A carton that one person can lift with both hands and no strain is the right size for a stair. Use these rules:

  1. Put heavy items such as books, tools and steel utensils in small cartons, and light items such as bedding in large ones.
  2. Fill every carton fully so the lid does not sag and the top box in a stack does not crush it.
  3. Label each carton with the room and the floor it started on, and write "fragile" on the side as well as the top.
  4. Take wardrobe doors, bed frames and table legs apart, and tape the screws in a labelled bag to the piece they belong to.
  5. Wrap sofas and mattresses in a cover and edge guards, since stair walls and railings mark them.

Our packing and unpacking service follows the same order, and the household shifting page explains the stages from quote to unloading.

Which items should I plan around before moving day?

Some pieces need a decision days before the crew arrives. Use this table to sort them.

Item What to check Plan
Wardrobe or almirah Can it pass the stair turn upright? Strip doors and shelves, or lower it by the balcony only if the crew says it is safe
Double bed Is the frame a solid or knock-down type? Take it apart and bag the fittings
Refrigerator and washing machine Door width, stair width, weight Empty, defrost and secure the door; the crew decides how many people carry it
Sofa set Width across the arms Remove legs if they unscrew; wrap each piece
Air conditioner Indoor and outdoor unit fixed to the wall Book a technician to remove it before the crew starts
Water purifier and geyser Plumbed in Disconnect them the day before

Whoever removes fixtures, such as an AC technician, must arrive before the crew, not during the loading.

How do I handle the shared stair and the other floors?

Tell the other households a few days ahead, say which hours you will use the stair, and ask for the landing to be cleared. A carton left on a landing for an hour makes every trip slower and every carry less safe.

Keep the following clear on the day:

  • shoes, plants and bicycles on your landing and the one below
  • the gate, so the truck can reverse in or stop beside it
  • a parking spot just outside, if you can reserve one with a cone or a word to a neighbour

If the building has a single passenger lift, ask the other floors whether it can be used for cartons for a short time. Never assume it can carry furniture.

What paperwork and handover should I sort before leaving?

Settle the keys, meters and any rent or deposit handover on a different day from the move. A move day is a bad day for a dispute about a deposit. Keep these papers with you, not in a carton:

  • the rent agreement or ownership papers
  • electricity and water bill details for the final reading
  • the keys and remote controls for the gate, garage and any lift

For construction rules for plots and floors, the Town and Country Planning Department of Haryana lists the Haryana Building Code and notices on its site. The Gurugram Metropolitan Development Authority lists building-plan approval and occupancy certificate services on its page. Those are the bodies that decide what a building may contain, and they are the right place to look if you are unsure about an alteration. Rules change, so confirm the current position yourself before you act on it.

Can I move in stages instead of in one day?

Yes, and for a large floor it is often safer. Move the bedrooms and kitchen on the first day, and leave bulky furniture for the next. If the new home is not ready, store the bulk until it is. The warehousing and storage page explains short and long stays, and our overview of packers and movers in Gurgaon lists the services we offer across the city.

Tip

Walk the route from your door to the gate with a measuring tape the evening before. Note the narrowest point and tell the crew; it saves a surprise on the day.

This article is general information, not legal advice. Check your rent agreement and the current local rules before acting on them.

Sources

  1. GurgaonWikipedia. Checked
  2. Town and Country Planning Department, HaryanaGovernment of Haryana. Checked
  3. Gurugram Metropolitan Development AuthorityGMDA. Checked